Hospital Vertical Expansion

PROJECT OVERVIEW

Client Name: Hospital Vertical Expansion
Location: St. Louis, Missouri
Services Provided: Electrical Installations, Low Voltage Systems, Power Distribution, Lighting Controls, Life Safety Systems, Building Automation Integration, Structured Conduit Systems, Laboratory Electrical Infrastructure
Industry: Healthcare / Research / Life Sciences

Kaiser Electric partnered on the vertical expansion of an occupied research facility, adding six new floors including advanced wet labs, BTCF spaces, and a BSL-3 laboratory environment. Working within an active, mission-critical building, our team delivered highly technical electrical infrastructure while supporting continuous operations and meeting the strict standards required for advanced research and laboratory spaces.

Vertical Expansion - Inside Work 2@2x
Vertical Expansion - Work 4@2x

SERVICES PROVIDED

  • Electrical installations
  • Low voltage systems
  • Power distribution
  • Lighting and lighting controls
  • Life safety systems
  • Building automation integration
  • Structured conduit systems
  • Laboratory electrical infrastructure
  • Coordination with third-party
  • Commissioning teams

OUR APPROACH

Kaiser Electric worked closely with the project team to execute electrical installations within a highly complex and occupied environment. Through Lean construction coordination, advanced 3D modeling, Trimble layout technology, and detailed field collaboration, our team maintained precision, safety, and uninterrupted facility operations while navigating tight ceiling spaces, airtight laboratory requirements, and evolving design conditions.

Model Pic - Vertical Expansion@2x

THE RESULTS

Successfully completed reliable, performance-verified electrical infrastructure for one of the campus’s most advanced research environments. The project delivered high-quality installations that met stringent biosafety, containment, and operational standards while supporting continuous occupancy and minimizing disruption to ongoing research activities.